Triggers a work order status update as if completed through the P17714.
The date/time fields will default if null and enabled todo so in the P17714's processing options.
If the EQST_szToEquipmentStatus field is populated the work orders equipment status will also be updated.
Data Structure
|
Name |
Type |
Inclusion |
Direction |
|---|---|---|---|
|
EFTB_jdStatusUpdateBeginDate |
DATE |
OPTIONAL |
IN |
|
BEGT_mnStatusUpdateBeginTime |
INTEGER |
OPTIONAL |
IN |
|
RMK_szStatusUpdateRemark |
STRING |
OPTIONAL |
IN |
|
EQST_szToEquipmentStatus |
UDC |
OPTIONAL |
IN |
|
UPLOW_cUpdateChildren |
CHARACTER |
OPTIONAL |
IN |
|
VERS_szP17714Version |
STRING |
OPTIONAL |
IN |
|
EV01_cSuppressErrors |
CHARACTER |
OPTIONAL |
IN |
|
DTAI_szErrorMessageDataItem |
STRING |
OPTIONAL |
OUT |
|
DOCO_mnOrderNumber |
INTEGER |
REQUIRED |
IN |
|
SRST_szWOStatus |
UDC |
REQUIRED |
IN |
|
EV01_cReserveObject |
CHARACTER |
OPTIONAL |
IN |